CURRENT STATUS OF NASIPIT AGUSAN DEL NORTE INDUSTRIAL ESTATE (NANIE)

 

AVAILABLE AREAS AS PER PROCLAIMATION NO. 56
Total Lot Area 62.0689
Total Lot Area Occupied 10.9 hectares;
Total Vacant Lot Area 51.1689 hectares
 
EXISTING STRUCTURES
1.) Marantha Gasoline Station 15 hectares (1,500 sq. m)
2.) Winrock 1 hectare (10,000 sq. m)
3.) Nasipit Tuna 3.86 hectares
4.) Agusan Milling/Marvel Corpation 4 hectares
5.) Adfil Corporation 2 hectares
6.) Department of Agriculture Quarantine 300 sq. m
7.) PPMG Post 2.4 hectares
Area Occupied 2,300 sq. m
Lot Area Vacant (land fill) 21,700 sq. m (2.17 hec.)
 
OTHER INFORMATION
1.) Proclamation of NANIE Proc. No. 56 Dated December 11, 1999
Environmental Compliance Certificate ECC No. 98-EC-LC-1301-001 Dated April 20, 1998

 

NASIPIT AGUSAN DEL NORTE INDUSTRIAL ESTATE (NANIE) PROJECT

 

THE SITE

     The project site is located in Barangay Camagong, Municipality of Nasipit, Province of Agusan del Norte and has a total area of 296 hectares. The area consists mainly of flat lands with some areas having a gently rolling terrain.

Site development is divided into four phases; namely,      

NANIE Phase I:     33 hectares for raw land industrial subdivisions, and utilities and pollution control sites.

NANIE Phase II:    96 hectares for commercial industrial, recreational, warehousing and administration facilities.

NANIE Phase III:   67 hectares for a shipyard facility for an integrated ship repair and manifacturing area; and,

NANIE Phase IV:   100 hectares as reserve areas for future expansion.

     It is situated along the National Highway having a frontage of about 1,896.39 meters and is in close proximity to the following areas:

          Port of Nasipit                         -     100 meters away

          Petron Nasipit Bulk Plant

          Nasipit Lumber Company

          Camagong Elem. School         -      25 meters away

          Butuan City                              -      25 Kilometers

          Bancasi Airport                         -     30 minutes away

     The National Highway which passes through the property is the main thoroughfare used in the transfer of people and goods to and from Butuan City and Cagayan de Oro City.

     The area is mainly used for residential and agricultural purposes. With the conversion of the property and its surrounding areas into an industrial zone, it is envisioned that the province will attain its full potential as the center of industry for the CARAGA Region. It has also been determined in recent studies that the area's current use as agricultural lands is no longer productive.

     The site and all the areas included in the NANIE project has all the advantages of being the center of trade, commerce and industry with them being in the center of the Southeast Asian territory.

     PROJECT OBJECTIVE

     The Nasipit Agusan del Norte Idustrial Estate (NANIE) was conceived by the Local Government Units of Agusan del Norte and Nasipit as well as some private groups to harness and make use of the area's full potential  as the main industrial center of the CARAGA Region. This was due in part to the closure of the province's main source of livelihood which revolved mainly upon logging. It is also the intention of the projects proponents to boost the sagging economy of the area by developing the area into a  mixture of light-industrial, commercial and residential areas.

     SITE AMENITIES

     1.)     Commercial Areas

     2.)     Light-Industrial Areas

     3.)     Warehouses-Storage Facilities

     4.)     Multi-purpose/Recreational Areas

     5.)     Integrated Shipyard Repair and Manufacturing Berthing Areas

     6.)     Open spaces/Parks - Roads

     7.)     Utility Areas/Security Facilities

     8.)     Administration Building/Area

     9.)     Parking Areas

THE INTENDED USAGE FOR THE INDUSTRIAL ESTATE IS SHOWN BELOW

TOTAL AREA TABULATION FOR NANIE PHASES I, II and III

 

  PARTICULARS AREA (Has.) PERCENTAGE (%)
1. Communication Area Mixed-Use 22.61 11.49
2. Industrial Area 45.22 22.99
3. Ship Repair and Mfg. 67.00 34.07
4. Storage/Warehouse 23.58 11.99
5. Open Space 8.53 4.34
6. Roads 29.72 15.11
  TOTAL 196.67 100.00

 

PROJECT COST ESTIMATES FOR PHASES I and II ARE CONTAINED IN THE FOLLOWING TABLE

 
PROJECT COST ESTIMATES
PHASES I and II COMBINED
 
NANIE

 

  PARTICULARS COST
1.0 Earthworks
- Grade Preparation
- Cut & Fill
- Grading

287,974,206.00
2.0 Roads Network
- Cubs and Gutters
219,350,030.00
3.0 Drainage System 168,006,180.00
4.0 Sewerage System 32,273,375.00
5.0 Electrical Distribution 75,402,340.00
6.0 Telephone Distribution 80,723,950.00
7.0 Electrical Distribution System
- Piping
- Water Tanks
- Pumps
26,372,880.00
8.0 Miscellaneous
- Administration Building
- Clubhouse
- Recreational Facilities
- Open Space/Park Development
- Perimeter Fence
- Utility Areas
- Staff Housing
23,670,450.00
  TOTAL COST (PHP) 913,673,465.00

 

     Figures quoted are for budgetary purposes only are subject to change pending mroe detailed plans and specifications. A 10% contingency and contractors mark-up is included in the estimates. Phase II estimates excludes areas which do not have studies yet.

     Figures also exclude professional fees for architects / engineers.

 

AREA TABULATION FOR NANIE PHASE II

 

PARTICULARS AREAS (hectares) PERCENTAGE (%)
Commercial/Mixed-Use 16.83 17.44
Industrial 33.65 34.87
Storage/Warehouse 17.55 18.19
Open Space 6.35 6.58
Roads 22.12 22.92
TOTAL 96.50 100.00

 

FUTURE INDUSTRIAL ESTATE EXPANSION AREAS

 

     Two expansion areas for industrial estate development are being prepared to mitigate against critical locational impediments such as intra-regional competition, regional bureaucratic rigidities, land prices speculation, land consolidation constraints and improper timing.

     NASIPIT INDUSTRIAL ESTATE EXPANSION PHASE II

     A 600 area adjacent to NANIE is presently under consideration for consolidation and negotiations with the owners. This area, situated along the national highway, is some three kilometers from the Nasipit International Port.

     BUENAVISTA INDUSTRIAL ESTATE EXPANSION PHASE II

     Similarly another 600 hectare located within the Municipality of Buenavista but contiguous with the proposed NANIE is also contemplated by this area, subject to an evaluation of the response to the first two areas.

 

LOCATIONAL COMPARATIVE ADVANTAGES

 

     NANIE is compared with the PHIVIDEC Industrial Estate located in Cagayan de Oro City which is some 190 kilometers south of Butuan City. It is the nearest industrial estate and accessible by the national highway in a three hour car ride.

     Assuming that the listed site location considerations are similar between the two estates, then power rates, water rates and lease rates will be deciding factors for a locator to choose from one of the two choices.

 

SITE SELECTION CONSIDERATION

 

     1.     zoning                                                                                           8.     surrounding development/existing firms

     2.     infrastructure conditions                                                               9.     ownership and financing profile

     3.     regulatory conditions                                                                  10.     communication     

     4.     site and buidling characteristics                                                  11.     proximity to an airport or seaport     

     5.     parking and greenbelt ratios                                                       12.     supply of workforce

     6.     site amenities                                                                              13.     ground conditions

     7.     transportation                                                                             14.     environmental control measures

 

PRESENT INFRASTRUCTURE FACILITIES

 

     Development of industrial estates within the Western Agusan Corridor of the Agusan del Norte Special Economic Zone is favored due to its distinct location. On top of this spatial advantage, the local government of Nasipit, with the support of the Provincial Government has already initiated the first phase development of the Nasipit Agusan del Norte Industrial Estate (NANIE).

     The NANIE is just 25 kilometers away from the Butuan Airport and even hosts the Nasipit International Port. A well-paved road connecting the industrial estate to any point in Mindanao allow for an efficient transfer of goods.

     NANIE is situated in an area with the abundant water supply. The Nasipit Water District has a total supply of 2,016,000 liter per day backed up by its two existing pumping station. The area is being provided with power by the Agusan del Norte Electric Cooperative, and, a back-up power source is readily available through the National Power Corporation (NPC) 100 MW power barge which is situated within the NANIE. Presently, telecommunciation is being provided by different private establishments like the RCPI and the PT & T. Also, a telephone company is providing within the municipality.

These services are targeted for expansion so that the domestic as well as international links can be established. The host municipality provides waste disposal services, However the Industrial Estate is designed to provide for its own waste disposal system.

© Provincial Government of Agusan del Norte 2020

•Powered by Python & React.js•
v.1.5.3